Playground planning mistakes are almost always cheaper to fix on paper than after installation. A layout problem caught at concept stage can usually be solved with a revised drawing. The same problem caught after equipment has been ordered, delivered or installed usually means extra work, wasted material and a delayed opening. What looks like an equipment problem on site, on closer inspection, often turns out to be a sequencing problem that started earlier: a decision made before the information needed to make it correctly was actually available.
This article covers general planning mistakes that apply to any playground project, regardless of who is commissioning it. Whether the project is run by a city, a school, a private developer or an individual investor, the same handful of planning gaps tend to recur, and the same habits tend to prevent them. For a full walkthrough of the planning process from first idea to installation, see our guide on how to plan a playground. If this is a public playground being delivered by a city or municipality, a separate set of considerations specific to that process applies, including public consultation and council approval. Those are covered in our article on how to plan a public playground for a city and are not repeated here.
The relative weight of each mistake listed below, as well as the specific rules that apply to safety zones, accessibility or budgeting, depends on the type of project, site conditions, and the local regulations and standards that apply where the playground is being built. These guidelines are a general planning reference, not a substitute for checking requirements against the applicable standards and the specifics of your project.