None of this means the concept design is unnecessary, or that it should be skipped in favour of going straight to the specification. The two documents are meant to work together, one after the other.
The typical sequence
In a typical public playground project, the concept design comes first. Its job is to align stakeholders around a vision, layout and general scope, and it is often the document used for public consultation, community engagement or initial budget approval. Once the concept design is approved, the technical specification follows, turning it into a binding, tender-ready document that suppliers will actually respond to.
What can, and cannot, change between the two stages
It is normal, and expected, for certain things to change between the concept design stage and the specification stage. As feasibility studies are completed, the budget is finalised, site conditions are properly assessed, and applicable standards and documentation requirements are worked out, adjustments to the original concept design are a normal part of good project development.
What should not change, however, is the underlying intent and scope stakeholders agreed on. The specification is not a formality that must confirm everything the concept design showed, but it should not become an entirely different project either. Its job is to translate the approved vision into something that can actually be built, procured and verified.
Questions to ask before moving from concept design to specification
Before a project moves from an approved concept design into drafting the specification, it is worth pausing to check that a few basics are genuinely in place: Has the concept design been formally approved? Has a budget range been established? Has the site been assessed for conditions that could affect equipment, surfacing or installation? Has someone been specifically assigned to turn the concept design into a specification? And is it clear which standards apply, including EN 1176 for equipment and EN 1177 for surfacing?
This list is offered as a general guide, not as a substitute for local procurement regulations or legal advice. Public procurement procedures and documentation requirements vary by country and project type.